Data Center Planning, Project Management and Software Installation

Asking the right questions before choosing products is half the project.

Schneider Electric APC Proje Yönetimi 5 photos

In a server room or small data center project, the most expensive mistakes are usually made during planning rather than product selection: a UPS with no headroom for growth, racks placed without thinking about cooling, or PDUs that do not match the electrical design. Starting with a needs analysis, capacity calculation and layout design makes every later step easier.

Schneider Electric supports the planning process with data center design guides, technical papers and calculation tools. Project management, installation and integration of EcoStruxure IT software, user training and contract-free on-demand service are also part of this ecosystem. Done right, power, cooling, racks and monitoring are commissioned as one coherent system rather than separate pieces.

Featured Models & Products

Data Center Planning ToolsProject Management ServiceEcoStruxure IT Installation ServiceStart-Up ServiceOn-Demand ServicePreventive Maintenance

Key Features

Needs and capacity analysis

Current load, growth targets and redundancy level are assessed together to size UPS, cooling and rack capacity.

Turnkey project management

Procurement, site preparation, installation and commissioning are coordinated in a single project plan.

Software installation and training

EcoStruxure IT and PowerChute software are installed and integrated, and teams are trained to use them.

On-demand service

Service can be requested when a fault or need arises, even for systems without a maintenance contract.

Use Cases

  • New server room builds
  • Office moves and relocations
  • Capacity expansion projects
  • Modernizing legacy infrastructure
  • Rolling out monitoring software

How to Choose the Right Model

Before the project starts, pin down three things: today's IT load and the estimate for three to five years out, the acceptable downtime, and the limits of your existing electrical and mechanical infrastructure. These inputs directly drive the redundancy level (N, N+1, 2N) and the budget. Do not leave software installation until the end; planning monitoring points together with rack and PDU selection makes commissioning far cleaner.

Frequently Asked Questions

Does a small server room need a project?
A single-rack room may not need a full project, but load, runtime and cooling should still be calculated. A short needs analysis prevents costly changes later.
How does on-demand service work?
Without an annual maintenance contract, you request service for fault diagnosis, repair or commissioning when you need it. For critical systems, a maintenance contract with defined response times is usually the safer choice.
Where do you run projects?
We are based in Izmir and carry out site surveys, installation and commissioning on site for projects across the Aegean region. The project scope is clarified together in the first meeting.

Let us pick the right model for your project

Contact our team for site survey, product selection, installation and after-sales support.